belmetioan Infurnia company

Managed manufacturing for design firms

We manufacture your cabinetry. Every panel verified, on site in seven days.

Instant pricing across 700+ in-stock finishes. Ply filmed at lamination. Sub-millimetre scanning on every panel before it leaves the floor. You order inside Infurnia — the platform we’re built on — and we take it from drawing to site.

Straight panel work · Bangalore · Now onboarding

Production drawing BLM-A2-0417 — wardrobe left side panelA drafting sheet showing a 596 by 2100 millimetre side panel at 1:10, a 1:2 detail of the System-32 drill line, a section through the panel showing a 5 millimetre blind hole 13 deep in 18 millimetre BWR ply, and a title block.1234ABCELEVATION1:10WR-L · SIDE PANEL2100596GRAINAABSCANNED · PASS26.04.26 · MAX DEV +0.14DETAIL B1:2 · DRILL LINE374 × 32 = 128Ø5.0 × 13 DEEP · SYSTEM 322 ROWS × 54 HOLES · 32 PITCHEDGE DISTANCE 37 BOTH SIDESSECTION A–A2:1 · PART1.0 PVC EDGE1318.037Ø5.0 × 13 DEEP BLIND · 5.0 MIN WALL0.8 LAM + 18.0 CORE + 0.5 BACKER= 19.3 MM OVERALLGENERAL TOL ±0.2 MM UNLESS STATED · FRONT EDGE 1 MM PVC · DO NOT SCALE FROM DRAWINGbelmetioMANAGED MANUFACTURING · BLRAN INFURNIA COMPANYTHIRDANGLEPROJECTMATERIALSCALEPARTFINISHUNITSDRAWING NOISSUEDREVPRJ-2291 WHITEFIELD18 MM BWR PLY1 : 10WR-L SIDE PANELMATTE 1104MMBLM-A2-041724.04.26C
7 daysOrder to site
700+In-stock finishes
100%Panels scanned
±0.2 mmDimensional tolerance

The design is signed off. Then the factory takes over and you stop having answers.

Three numbers your client will eventually ask you about, and which nobody in the chain currently owns.

21 35

Days, promised vs actual

The slip lands on you. Your client rings the design firm, never the factory.

40%

Spread between quotes

For the same drawing, from three factories — and priced after the order, not before it.

5%

Panels short on arrival

Industry-wide. Found during installation, with the carpenter already on site.

Process

You draw it once.
We take it from there.

Design and price at your own pace. The seven-day clock only starts when you place the order — and it has never been the design stage that runs late.

Take as long as the design needs. The clock hasn’t started.

Not designing in Infurnia yet? Book a call and we’ll set up your first project with you.

Before the clock

  1. 01

    Design in Infurnia

    One model. What the client approves is the same geometry we machine — nothing is redrawn downstream.

  2. 02

    Instant pricing, live stock

    Costed as you draw, across 700+ finishes held in stock. If it's in the catalogue it's procurable in a day, so the quote doesn't move.

  3. 03

    Production design

    We convert the model to machine-ready files — nesting, edging, drill patterns — and check them before a sheet is cut.

Day 0 · Order placed

  1. 04

    Manufacture & verify

    Ply filmed at the pasting station. Every panel scanned against its production file; anything outside tolerance is recut before it can be packed.

  2. 05

    Packed & delivered

    Every panel is scanned into its box, so the box list and the cut list agree. On site day 7.

Day 7 · On site

Your client asks what’s inside the panel. We can answer to the glue line.

Everything below is what we hold ourselves to on your job — the build-up we buy, the edge we run, and how your sheets are actually cut.

SECTION · 18 MM BWR PLYSCALE 10 : 1 · 13 PLIES · ALTERNATING GRAIN18.019.3 O/A0.8 DECORATIVE LAMINATEMATTE 1104 · SUEDE FINISH0.5 FACE VENEERGRAIN PARALLEL TO LENGTH1.55 CROSS BANDGRAIN PERPENDICULAR12 × PHENOLIC GLUE LINEIS 303 BWR · BOILING WATER1.55 CORE VENEER5 LONG · 6 CROSS0.5 BALANCING BACKERRESISTS BOW & CUPSPECIESBONDINGDENSITYCALIBRATIONMOISTUREGURJAN FACE / MIXED HARDWOOD COREPHENOL FORMALDEHYDE · IS 303 BWR680–720 KG/M³SANDED BOTH FACES · ±0.2 MM8–12 %
Fig. 01What 18 mm actually is. Thirteen plies, twelve glue lines, faces balanced so the panel stays flat on a wardrobe gable.

We film every board at the pasting station before it goes into lamination, and the clip stays attached to your project file. The label on the delivered panel resolves to the same batch record — so “what ply did you use” is a lookup, not an argument.

Ply, edge band, glue and sheet yield are the four places a manufacturer quietly saves money. All four are written down here and on your job sheet.

EDGE PROFILE · 1 MM PVCSCALE 6 : 11.0R0.2 TRIM0.15 PUR0.8 LAMINATE0.5 BALANCING BACKER18 MM BWR PLY CORE18.0TRIMMED & SCRAPED FLUSH IN ONE PASS · NO VISIBLE GLUE LINEBAND COLOUR MATCHED TO FACE LAMINATE · MATTE 1104
Fig. 02Front edges only, on straight panel work. PUR rather than EVA, so the joint doesn’t open when the kitchen gets steamy.
NEST · SHEET 06 OF 41ORD-2604-33 · 18 MM BWR PLY · MATTE 1104SAW KERF 4.4 · TRIM 10 ALL ROUND · SCALE 1 : 20UTILISATION 90.1 %GRAIN DIRECTION · LOCKEDSIDE PANEL · WR-LSIDE PANEL · WR-R2100 × 596 · EDGE 1F2100 × 596 · EDGE 1FTOP RAIL 300 × 596OFFCUT 316 × 600 · TO RACK244012202100PART ORIGIN MARKED ● · EVERY PART CARRIES ITS OWN LABEL AT THE SAW · OFFCUTS OVER 300 MM RETURN TO STOCK
Fig. 03Your sheet, nested. Utilisation is calculated per order, offcuts above 300 mm go back on the rack, and the yield is visible to you rather than buried in a per-square-foot rate.

Traceability chain — PRJ-2317 Sadashivnagar

  1. 01PLY-8842Ply lot · Gurjan face, IS 303 BWRReceived 21 Apr
  2. 02LAM-0426-B14Press batch · filmed at the pasting station26 Apr · 11:04
  3. 03WR-L-02Panel · scanned against its production file28 Apr · 16:22
  4. 04BOX 07 / 24Carton · panel scanned in, not counted in01 May · 09:40

Every panel leaves with a label carrying its own chain. Read it on site with the client standing next to you and the lamination clip for that exact press batch opens in the project file — no phone call, no “we’ll check with the factory”.

ORD-2604-33 / Whitefield Residence / 512 panels · 41 sheets

Day 5 of 7 · updated 14:06 IST

  1. 01

    Order placed

    26 Apr · 09:12

  2. 02

    Production file

    26 Apr · 16:40 · rev C

  3. 03

    Cut & edged

    28 Apr · 10:05 · 41 sheets

  4. 04

    Laminated

    29 Apr · 11:04 · filmed

  5. 05

    QC scan

    438 of 512 panels · 3 recut

  6. 06

    Packed

    24 cartons · scanned in

  7. 07

    On site

    Sat 02 May · 08:00–11:00

Complete
Running now
Scheduled

One record per order, written by the floor rather than by an account manager. Step 06 is a scan, not a count — every panel is read into its carton, so the box list and the cut list have to agree before a truck is loaded.

Belmetio is built by Infurnia — the design-to-manufacturing platform 220+ firms and factories already run on. Your drawing becomes the production file, the machine instructions and the QC benchmark. One file, end to end.

Nothing retypedNothing re-modelledNothing left to interpretation

Now onboarding

First projects starting this month.

  • AreaBangalore only, for now
  • ScopeStraight panel work
  • SupportFounder-led onboarding for the first ten firms

What the 15 minutes covers

  1. We price one of your live drawings, on the call.
  2. We walk your first order through the seven days.
  3. If you're not on Infurnia yet, we set the project up with you.

We reply within one working day. No sales sequence.